Figure 24: Shipping Package Contents - Allied Telesis AT-GS950/28PS Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for AT-GS950/28PS:
Table of Contents

Advertisement

Figure 24. Shipping Package Contents
GS950/PS Series Switches Installation Guide
Two equipment rack or
wall brackets
Eight bracket screws
Four wall anchors
Four wall screws
Four rubber feet (for
desktop installation)
One regional AC
power cord
One power cord
retaining clip (not
included with
AT-GS950/48PS)
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/48psAt-gs950/16psAt-gs950/10ps

Table of Contents