14. Filling in the commissioning certificate

14 Filling in the commissioning certificate
Please tick off the work carried out and write down the measurement values
Date
Company
Installation
Carry out a gas tightness check
Check the fresh air / flue gas pipe
Check the tightness of the flue gas pipe
Check the neutralisation equipment if used
Compare the information on the appliance's rating plate with the type of gas available in situ
Wobbe Wo index (international Ws) of the type
of gas available
HuB (international HiB) lower calorific operating
output of the type of gas available
Check the pressure of the gas connection on
the measurement connection (dynamic
pressure)
Boiler temperature
Flue gas temperature / Ambient temperature
Measure the carbon gas level in the flue gases
(CO
)
2
Measure the carbon monoxide level in the flue
gases (CO)
Calculate the loss via the flue gases
Carry out a functional check
Set the control
Inform the user of the installation on the control and give him the operating instructions
Signature / Company stamp