Connected Control Pcbs; Commissioning; Chimney Sweep Mode (Forced Full Load Or Part Load); Maintaining The Installation - DeDietrich EVODENS PRO Amc 45 Service Manual

Control panel & high-efficiency wall-hung gas boiler
Table of Contents

Advertisement

Fig.84
Load AMC Pro 115
120
107
100
80
60
Q
40
20
0
1500
2500
3500
4500
R
Fig.85
Step 2
Fig.86
Step 3
Fig.87
Step 4
6.4

Commissioning

Fig.88
Step 1
Fig.89
Step 2
Fig.90
Step 3
6.5

Maintaining the installation

7725106 - v.01 - 05062019
M Maximum heat input
F Factory setting
Q Input (Hi) (kW)
M
R Fan speed (rpm)
F
5500
6500
7500
6800
AD-4100431-01
6.3.2
1. Navigate to the control PCB menu.
2. Press the
MW-3000339-01
3. To see which control PCBs are connected, press the
MW-3000340-01
4. Press the
MW-3000341-01
6.4.1
1. Press the two keys on the left simultaneously to select chimney sweep
mode.
MW-3000325-01
2. Press the
MW-3000326-01
3. Press the
MW-3000327-01
6.5.1
Reading out counters
You can read out the counters of the appliance and the connected control
boards, sensors and so on.
1. Navigate to the Counter menu.

Connected control PCBs

key to open the menu.

key twice to go back to the main display.

Chimney sweep mode (forced full load or part load)

The device is now running at part load. Wait until
on the display.
key twice.
The device is now running at full load. Wait until
on the display.

key to go back to the main display.

Reading out measured values

6 Installer instructions
key.
appears
appears
AMC Pro
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents