Instrument Tour; Front Panel Tour - R&S SGU100A Getting Started

Sgma upconverter
Table of Contents

Advertisement

®
R&S
SGU100A
3

Instrument Tour

The following topics help you get familiar with the instrument and perform the first
steps:

Front Panel Tour

Rear Panel Tour
This section explains the control elements and the connectors of the R&S SGU
with the aid of the front and rear views. Specifications of interfaces can be found
in the data sheet.
3.1
Front Panel Tour
This section provides an overview of control elements on the front panel of the
R&S SGU. The connectors of the R&S SGU are placed on the rear panel and are
described in
Chapter 3.2, "Rear Panel
intended to be remote-controlled, the front panel of the R&S SGU contains no dis-
play but mostly LEDs to inform you about the status of the instrument. The user
interface can be displayed on a remote PC station used to manually remote con-
trol the instrument.
Figure 3-1: Front panel view
[POWER ON /STAND BY]
The [POWER ON /STAND BY] key switches the instrument from the standby to
ready state or vice versa.
In ready state, the button is green. The instrument is ready for operation.
Getting Started 1418.2070.02 ─ 08
Tour",
on page 30. As the R&S SGU is
Instrument Tour
Front Panel Tour
28

Advertisement

Table of Contents
loading

Table of Contents