3.2.2 Install the Optional Rack Slide Set

If the converter is to be mounted on slides, install the provided bearingless rack
slide set into the rack cabinet, and onto the sides of the UT-4500. Use the
hardware provided with the slide set that is determined to be appropriate for
installation.
CEFD Part Number
FP/SL0006
FP/SL0008

Figure 3-4. Install the Optional Rack Slide Set

Do these steps to install the slide set (Figure 3-4):
1. Use the provided hardware to install one slide onto each side of the unit
chassis.
2. Use the provided hardware to install the slide rail components into each
interior side of the equipment rack cabinet.
3. Install the unit into the front of the equipment rack. Make sure that the
slides properly engage the cabinet-mounted slide rails.
Description
Bearingless Rack Slide Set – 26"
Bearingless Rack Slide Set – 24"
3–7
MN/UT4500.IOM
Revision 3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UT-4500 Series and is the answer not in the manual?

Questions and answers

Table of Contents