Pace PRC 2000 Operation & Maintenance Manual page 81

Hide thumbs Also See for PRC 2000:
Table of Contents

Advertisement

When the Foot Pedal Selector Switch is set in the PD position, the dispense
pump will run for a few seconds to provide a reservoir of pressurized air
necessary for proper dispensing. The pump will also cycle every 2 minutes
to maintain reservoir pressure.
OPERATION
PACE recommends that the operator become familiar with the operation of the dispenser by first applying
the material to a piece of paper or scrap PC board. Use this method to obtain the desired results for each
dispensing material and application.
MATERIALS USED FOR DISPENSING
Always refer to the Material Safety Data Sheet supplied with the material as
a guide for proper handling and safety precautions.
Barrels prefilled with solder creams and brazing pastes of 400,000 to 600,000 centipoise viscosity may be
dispensed using the needle size selections provided with your system.
DO NOT attempt to dispense materials with viscosity levels lower than
400,000 centipoise. Low viscosity materials will not dispense properly.
NOTE
CAUTION
NOTE
81

Advertisement

Table of Contents
loading

Table of Contents