Thermal Management Center; Power Up - Pace PRC 2000 Operation & Maintenance Manual

Hide thumbs Also See for PRC 2000:
Table of Contents

Advertisement

THERMAL MANAGEMENT CENTER

POWER UP

1. Insure that the system is properly prepared for
operation. Refer to the "Set-Up" portion of this manual.
The handpieces selected for your application should be
connected to the unit. Connect any single air hose to
either the SNAP-VAC Port or Controllable PRESSURE
Port. Never connect air hoses to both ports
simultaneously. Always leave VisiFilter connected to
SNAP-VAC Port.
2. Turn the POWER Switch ON ("1").
3. On power up, the Digital Readout will display "888"
initially; change to "1 - 3" (this number may be different
on your system) and then display normal temperature
information (Temperature Display Mode).
38
Figure 24. Power On
Figure 25. Digital Readout "888"

Advertisement

Table of Contents
loading

Table of Contents