Calibrate Chemical Dosage - Graco Wolverine A261 Series Instructions-Parts List Manual

Chemical injection pump
Table of Contents

Advertisement

Operation

Calibrate Chemical Dosage

1. Begin the process by setting the cycle rate and/or
stroke adjustment of the pump to an estimated set-
ting for a desired flow rate. See Baseline Chemical
Dosage Settings, page 25, for tables of cycles per
minute (CPM), and corresponding gallons per day
(GPD) and liters per day (LPD).
2. Follow the instructions provided with your calibration
gauge in conjunction with the Baseline Chemical
Dosage Settings, page 25.
3. Adjust the cycle rate and/or stroke adjustment
accordingly after the test is performed. Increasing
the cycle rate and/or stroke adjustment of the pump
will increase the pump flow rate, while decreasing it
will decrease the flow rate.
4. Repeat the instructions provided with your calibra-
tion gauge to verify changes.
5. Repeat steps 3 and 4, as necessary, until the
desired flow rate is achieved.
24
Stroke Adjustment
This pump has infinite stroke adjustment positions
between full stroke and half stroke.
1. Disconnect main power from pump.
2. Expose the drive shaft (9c) by loosening the cap
screws (61) and removing the drive guard (60). The
cap screws will remain with the drive guard.
3. Loosen the stroke adjustment nuts (9d), and move
to desired stroke location and re-tighten. Moving the
adjustment nuts towards the pump will decrease the
stroke, and moving them towards the cam will
increase the stroke.
9d
F
. 15 Wolverine stroke adjustment
IG
4. Reassemble the drive guard (60) to pump.
334513N

Advertisement

Table of Contents
loading

Table of Contents