This section shows you steps to install a switch in an equipment rack using
the AT-RKMT-J14 kit.
Before installing a switch to an equipment rack, make sure that the
following items are ready.
Two AT-RKMT-J14 rack mount brackets
Two AT-RKMT-J14 handles
Four M3x6mm screws (Included in the AT-RKMT-J14 kit)
Eight M4x6mm screws (Included in the AT-RKMT-J14 kit)
Four screws for the equipment rack
Phillips-head screw driver
To install a switch in a rack using the AT-RKMT-J14 rack mount kit,
perform the following procedure:
1. Review "Reviewing Safety Precautions" on page 26 and "Selecting a
Site and Planning the Installation" on page 29 before performing this
procedure.
2. Place all the items from the packaging on a work table.
3. Attach the handles to the brackets as shown in Figure 19.
Figure 19. Attaching the Handles to the Brackets