Waters 2998 Operator's Manual page 56

Photodiode array detector
Hide thumbs Also See for 2998:
Table of Contents

Advertisement

Use a 1/4-inch flat-blade screwdriver to loosen the three
thumbscrews on the flow cell assembly's front plate.
Grasp the handle and gently pull it toward you.
6.
Unpack and inspect the new flow cell.
7.
Square the flow cell assembly in front of the opening, and then insert it
into the optics bench. Note that the flow cell uses the alignment pins on
the optics bench.
8.
Gently push the front of the assembly until it seats on the front
alignment pins.
Installing the analytical flow cell assembly
9.
Continue to insert the flow cell until the three thumbscrews align with
their holes in the bulkhead.
Caution:
is properly seated in the bulkhead, alternate between tightening
the captive screws and pushing the flow cell forward.
3-6
Maintaining the Detector
Alignment pin
Flow cell handle
To prevent the flow cell from binding and ensure that it
TP02755

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents