Initial Start Up - ELGA PURELAB Classic - US Operator's Manual

Table of Contents

Advertisement

ELGA
By-pass block
By-pass block hanger
Location of By-pass Block
Initial Rinse Screen
5.6

Initial Start Up

Step 1 - Prepare Water Supply
1. The PURELAB Classic should be installed correctly as
described in Section 5.3.
2. TURN ON the feedwater supply to the unit and adjust
the inlet pressure.
3. CHECK all tube connections are watertight and that
there are no leaks.
Step 2 - Prepare By-pass Block
1. OPEN front door.
2. CHECK by-pass block is correctly located and locked in
place.
3. CLOSE door.
CAUTION!
Step 3 - Initial Rinse
1. Connect a temporary tube from the dispense outlet to a
suitable drain or sink.
2. SWITCH ON electrical supply.
3. Press
the
automatically go into a rinse procedure (36 mins) to
rinse the unit. This rinse must be completed; the
process function will be inhibited until the rinse is
complete.
4. Upon completion of the rinse the unit will bleep.
Step 4 - Remove By-pass Block
1. SWITCH OFF power.
2. OPEN the door.
3. REMOVE by-pass block and pour contents away.
4. STORE by-pass block on hanger inside the door.
CAUTION!
PURELAB Classic Version 2 11/15
PURELAB Classic Operator Manual
Unit
contains
trace
preservatives
used
manufacturing. Rinse to drain to avoid
system contamination.
dispense
controller.
Before installing the purification pack,
ensure the correct date has been set as
described in Section 5.4 step 4 - Date.
Failure to enter the correct date may
result in premature replacement of the
Purification Packs.
levels
of
during
the
The
unit
will
Page 23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents