Mounting The Iq 300 Display And Base Modules Separately - Eaton Cutler-Hammer IQ 300 Series Instructions For Installation, Operation And Maintenance

Table of Contents

Advertisement

IL17574C
Page 3-4
IQ 300
Menu
Figure 3.3 Dimensions for the IQ 300 Display Module with Base

3.2.2 Mounting the IQ 300 Display and Base Modules Separately

In all instances where the IQ 300 Base Module is mounted remotely, the IQ 300
Display Module Chassis must be connected to earth ground.
Display Module: Cut a 9.38" H x 5.38" W access cutout in the switch gear door or
other panel where the IQ 300 is to be mounted as shown in figure 3.1. Install the IQ
300 Display Module as shown in figure 3.1, following these steps:
• Slide the supplied gasket over the rear of the IQ 300 Display Module and
mounting studs until it is flush with the rear of the back cover.
• Insert the IQ 300 Display Module with gasket installed into the cutout.
• Insert one end of the Category 5 cable into the port on the rear of the Display
Module.
• Installing from the rear, use the 10 mounting screws provided to secure the display
to the panel.
Base Module: Select a location for the IQ 300 Base Module. Depending on the
location, use the mounting holes in the flange on the front face of the IQ 300 Base
Module, the supplied L bracket, or the DIN clip to secure the IQ 300 Base Module in
the desired location and orientation. Typical mounting options are shown in figure
3.4. The hole drilling pattern for mounting the IQ 300 Base Module to floor, wall or
Page 3-4
For more information visit:
Effective Date: 2/04
Normal
Program
Enter
Scroll
IQ 300
www.cutler-hammer.eaton.com
Effective Date: 2/04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents