Bearing And Basket Replacement - Preferred Method - Maytag Commercial MYR20 Service Manual

Multi load washer
Hide thumbs Also See for MYR20:
Table of Contents

Advertisement

BearinG anD BaSKeT repLaCeMenT -
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before
operating.
Failure to do so can result in death or
electrical shock.
1. Remove the front panel (See page 4-32).
2. Remove the ornament panel
(See page 4-35).
3. Mark the outer tub and tub cover for proper
orientation during reassembly.
13mm
Hex Nut
4. Loosen the 13mm hex nut on the top tub
cover clamp until finger tight.
5. Loosen the 13mm hex nut on the bottom
tub cover clamp until finger tight.
preFerreD MeTHOD
6. Remove the tub cover and clamp.
7. Install a two arm gear puller in the weep
8. Use a bolt with centering hole so the gear
9. Drive the basket forward, pushing the shaft
4-44
Tub Cover
Clamp
holes of the bearing house.
puller will not slip.
through the bearings in the bearing house.
Excessive Weight Hazard
Use two or more people to lift and
move basket.
Failure to do so can result in back
or other injury.
Tub
Cover

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Myr30Myr25Myr40Myr55Myr65

Table of Contents