Operational Check Procedures; Verification Limits - Agilent Technologies U3025AE10 User Manual

Hide thumbs Also See for U3025AE10:
Table of Contents

Advertisement

U3025AE10

Operational Check Procedures

This section provides the test calibration procedure to confirm the U3025AE10 and PNA
operational performance. The operation verification limits provided ensure that your
U3025AE10 and PNA are operating properly.

Verification Limits

Specifications for the U3025AE10 Multiport Test Set are typical. System performance for
the PNA and Test Set are only characteristic and intended as non warranted information.
A functional certificate is provided for the U3025AE10 only.
It is recommended that you return your instrument to Agilent Technologies for servicing or
repair if the Test Set and PNA performance exceed the operational verification limits.
NOTE
Table 9
Frequency
10 MHz to 45 MHz
45 MHz to 500 MHz
500 MHz to 2 GHz
2 GHz to 10 GHz
10 GHz to 20 GHz
20 GHz to 30 GHz
30 GHz to 40 GHz
40 GHz to 45 GHz
45 GHz to 50 GHz
NOTE
32
This Manual:http://www.manuallib.com/agilent/u3025ae10-test-set-user-guide.html
Typical specifications are based on 1 to 2 units performance.
Operational Check Reflection Tracking Loss
Standard (dB)
−0.5
+3.0
+0.5
−1.5
−3.5
−6.5
−8.0
−10.5
−12.5
If you suspect that your 12-Port configuration is not operating properly,
ensure that all front RF jumper interconnect cables are correctly attached.
Operational Check Procedures
Option 001 (dB)
−1.0
+2.5
0
−2.0
−4.0
−11.5
−12.5
−14.0
−16.0
User's Guide U3025-90001

Advertisement

Table of Contents
loading

Table of Contents