Fieldbus Cables: Connect - AUMA SQEx 05.2 Operating Instructions Manual

Part-turn actuators. control unit: electronic (mwg) with actuator controls. acexc 01.2 non-intrusive
Hide thumbs Also See for SQEx 05.2:
Table of Contents

Advertisement

Electrical connection
6.4.3.

Fieldbus cables: connect

36
SQEx 05.2
SQEx 14.2/SQREx 05.2
Figure 33: Terminal assignment for line topology (1-channel or 2-channel for AUMA
redundancy I or II)
Channel 1: Further fieldbus devices will follow (standard)
Channel 2: Further fieldbus devices will follow (AUMA redundancy I or II only)
Last fieldbus device
n 1
Fieldbus cable from previous device (input)
n+1
Fieldbus cable to next device (output)
[XK] Terminal assignment according to wiring diagram (customer connection):
Channel 1: Terminals 31, 32 and 33, 34
Channel 2: Terminals 35, 36 and 37, 38 (AUMA redundancy I or II)
Connect fieldbus cables:
1.
Connect bus cables.
Always link A connections to green wire and B connections to red wire.
2.
If the actuator is the final device in the fieldbus segment (line topology only):
2.1 Connect termination resistor for channel 1 through linking the terminals
31 - 33 and 32 - 34 (standard)
2.2 For AUMA redundancy I or II: Connect termination resistor for channel 2
through linking the terminals 35 - 37 and 36 - 38.
SQREx 14.2 Control unit: electronic (MWG)
ACExC 01.2 Non-Intrusive Profibus DP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents