MAINTENANCE

Before carrying out maintenance work, the plant-specific and process-specific safety measures must
be observed!
Warning
The maintenance cycles depend on the process conditions and must therefore be determined for each
specific application.
All parts to be serviced are easily accessible and installed in the sample gas conditioning case. These
are (see Figure 3):
• The filter element of the preliminary filter FPF+2 μm Fig. 3/
• The filter element of the secondary filter FPF-0.1 μm Fig. 3/
Note
• Check the tubing of the SR25.2 Fig. 3/
necessary (see operating instructions in the appendix);
• Check the diaphragm of the gas feed pump N5 KPE Fig. 3/
necessary.
www.mc-techgroup.com
Dangerous voltage.
Before carrying out any work on the gas conditioning unit, move the
main switch to position "0" and pull out the mains plug!
In order to protect downstream analyzers, the wet filter element
must always be replaced after a condensate ingress.
condensate pump every six months and replace it if
PSS-20 | 1.00.01
.
⑦.
every six months and replace if