Installation Instructions - M&C PSS Series Instruction Manual

Portable gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

10

INSTALLATION INSTRUCTIONS

Note
www.mc-techgroup.com
The gas conditioning device should be set up away from heat sources
and freely ventilated so that no unwanted heat accumulation occurs.
The case should be placed on an even horizontal surface to ensure a
secure and stable position.
The operating position is exclusively vertical. Only in this case is the
proper condensate separation and discharge in the heat exchanger of
the cooler guaranteed.
For outdoor installation, adequate protection against direct sunlight
and moisture must be provided. In winter, the installation site must
be frost-free; observe the protection class of the case.
To ensure the operational safety of the portable gas conditioning unit
and the downstream analyzers and to avoid false alarms, the sample
gas conditioning unit must not be used outside the specified
temperature range.
Downstream analyzers must always be operated at temperatures
well above the specified gas output dew point of +5 °C. The
temperature range of the downstream analyzers must not be
exceeded. This avoids any condensation of the gas in the connecting
lines to the analyzers.
Unheated gas sample lines must be installed with a gradient down to
the cooler. Condensate pre-separation is then not necessary.
PSS-20 | 1.00.01
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pss-20760-280200000

Table of Contents