COMMISSIONING

Before commissioning, the plant-specific and process-specific safety measures must be observed.
Note
The following steps must be carried out before initial commissioning:
1. Plug the power plug of the supplied power cable into the power socket.
2. Connect the heated sample line (optional).
Warning
3. Connect the mains plug to the mains.
4. Switch the main switch to position 'I'.
5. Set the desired temperature on the temperature controller TC1,TC2 (optional).
Figure 8
702 Temperature controller display
The digital display of the Model 702 temperature controller shows the actual value of the temperature.
Adjust the setting value by pressing the up and down arrow on the thermostat. After adjusting the
desired setting value, press the input key on the far left to confirm, or wait 2-3 seconds for the
thermostat to automatically enter and confirm.
The PSS-20 sample gas cooler is ready for operation after approx. 5 minutes. The overtemperature
alarm contact of the cooler switches the sample gas pump automatically on when the cooler reaches
the temperature of <+8°C [46.4 °F].
22
Before connecting the equipment to the supply voltage, the
main switch must be in position "0".
When operating the sample gas conditioning system with a heated
sample line, the temperature must be checked at the temperature
controller.
PSS-20 | 1.00.01