Figure 107
1. Flange (coupling adapter)
2. Flange (section-manifold
valve)
4.
For left or right section-valve manifolds, remove
the 2 flange-head bolts (1/4 x 3/4 inch) and
2 flange locknuts (1/4 inch) that secure the
section-valve manifold to the valve support
(Figure
108).
Figure 108
1. Flange locknut (1/4
inch—left and right
section-valve manifold
positions)
2. Section-bypass valve
3. Quick-connect fitting
(section-valve manifold)
g191300
3. Section-manifold valve
4. Flange clamps
g191304
4. Flange (coupling adapter)
5. Gasket
6. Flange-head bolt (1/4 x
3/4 inch—left and right
section-valve manifold
positions)
5.
Move the section-valve manifold and gaskets
down to clear the section-bypass valve and then
away from the machine
Note:
If needed, loosen the mounting hardware
for the left or right section-valve manifolds as
needed to provide clearance.
Note:
Retain the flange clamps, gaskets and
quick-connect pins for installation in
the Section-Manifold Valve (page
Cleaning the Manifold Valve
1.
Position the valve stem so that it is in the closed
position
(Figure
1. Valve open
2.
Remove the 2 end-cap-fitting assemblies from
each end of the manifold body
Figure
111).
78
(Figure
108).
Installing
80).
109B).
Figure 109
2. Valve closed
(Figure 110
g027562
and