Figure 105
1. Manifold (agitation valve)
2. Valve support
3. Flange locknut (1/4 inch)
4.
Remove the agitation-valve manifold and
gaskets from the machine
Note:
If needed, loosen the mounting hardware
for the pressure-filter head as needed to provide
clearance.
Note:
Retain the flange clamps, gaskets and
quick-connect pins for installation in
the Agitation-Manifold Valve (page
g191302
4. Flange-head bolt (1/4 x
3/4 inch)
5. Gasket
(Figure
105).
Installing
81).
Removing the Section-Manifold
Valve
1.
Remove the quick-connect pin that secures the
quick-connect coupler for the section-bypass
valve to the section-manifold valve
1. Section-bypass valve
2. Quick-connect pins
2.
Remove the quick connect pin that secures the
quick-connect coupler for the section supply
hose to the manifold for the quick-connect fitting
of the section-manifold valve
3.
Remove the 2 flange clamps that secure the
section-manifold valve to the flanges of the
adjacent components
77
(Figure
Figure 106
3. Quick-connect coupler
(section supply hose)
4. Quick-connect fitting
(agitation valve manifold)
(Figure
106).
(Figure
107).
106).
g191303