Check Before Recharge; Battery Recharge Methods - Huawei SmartLi 2.0 User Manual

Hide thumbs Also See for SmartLi 2.0:
Table of Contents

Advertisement

SmartLi 2.0
User Manual
0–
No action is required. Use
40°C
the battery module as soon
as possible.
Irreversible capacity loss may occur during storage. The following table lists the
details for reference.
Table 3-2 Mapping between capacity loss and storage temperature
Temperature
Irreversible Capacity Loss

3.2.3 Check Before Recharge

Before recharging a battery, you need to check its appearance. Recharge the
battery if it is qualified.
Check the appearance of a battery module. The battery module is qualified if it is
free from bulging, damage, misshaping, and leakage. Dispose of the battery
module if any of the preceding exceptions occurs.

3.2.4 Battery Recharge Methods

● Ensure that the charge process is supervised to prevent any abnormality.
● If a battery experiences an abnormality such as bulging or smoking, stop
● Ensure that only trained professionals perform recharge operations.
Currently, two charging methods are available. Select one based on site
requirements.
Issue 09 (2022-01-30)
First
recha
rge
NO TE
● If batteries have been stored overdue, promptly report the event to the department
leader.
● Dispose of deformed, damaged, or leaking batteries directly irrespective of how long
they have been stored.
● The storage duration starts from the latest charge time labeled on the battery package.
If a battery is qualified after recharge, update the latest charge time and the next
recharge time (next recharge time = latest charge time + recharge interval) on the label.
● The total storage duration should not exceed the warranty period.
CA UTION
charging immediately and dispose of it.
Copyright © Huawei Technologies Co., Ltd.
Second
recharge
Storage at 0–40°C for 18 months
2–12%
3 Transportation and Storage
Third
Fourt
Fifth
recha
h
recha
rge
recha
rge
rge
Sixth
Disp
recha
ose
rge
of it.
32

Advertisement

Table of Contents
loading

Table of Contents