UPS2000-H-(6 kVA–10 kVA)
Quick Guide
Issue
01
Date
2022-06-30
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS2000-H

  • Page 1 UPS2000-H-(6 kVA–10 kVA) Quick Guide Issue Date 2022-06-30 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the installation, cable connection, and power-on commissioning for the UPS2000-H-(6 kVA–10 kVA) series. Figures provided in this document are for reference only. Intended Audience This document is intended for: ●...
  • Page 4 NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. Change History Issue Date Description 2022-06-30 This is the first official release. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    1.4.2 Feedback Protection Connections (With Dry Contract Control)............... 28 1.5 Installing a 4G Module............................... 28 1.6 Checking the Installation..............................30 2 Power-On Commissioning....................32 2.1 Checking Before Power-On..............................32 2.2 Lithium Battery..................................32 2.2.1 Single UPS Operations..............................33 Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 2.3.1.3 Starting the Inverter..............................49 2.3.1.4 Powering On Loads............................... 52 2.3.1.5 Shutting Down the UPS............................... 52 2.3.1.6 Cold-Starting the UPS Using Batteries........................53 2.3.1.7 Performing EPO................................54 2.3.2 Parallel System Operations............................54 Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7: Installation And Cable Connection

    Ensure that the floor can bear the weight of the UPS and its optional components. Installation Environment ● Do not install the UPS in a hot, cold, or damp place that is beyond the technical specifications. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8 Clearances of at least 500 mm should be reserved in front of and behind the chassis. Figure 1-1 Clearances for the 6 kVA model (unit: mm) Figure 1-2 Clearances for the 10 kVA model (unit: mm) Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Tools

    Hardware installation tools Flat-head Phillips insulated Utility knife Marker insulated torque torque screwdriver screwdriver (2 mm) (M4/M6) Cable installation tools Wire stripper RJ45 crimping Electro-hydraulic Heat gun tool pliers Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 Diagonal pliers Crimping tool Hydraulic pliers crimping tool Cable cutter Measurement instruments Clamp meter Multimeter Network tester Engineering auxiliary materials Label Cable tie Cotton cloth Heat-shrink tubing Insulation tape Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11: Materials

    ● The leakage current of the 6 kVA UPS and 10 kVA UPS is less than or equal to 50 mA, respectively. When selecting an RCD, consider the leakage current of the UPS and its downstream loads. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12 M6-90° phase input L2 AC/240 V bending input 16 mm OT-16 mm single- INPUT/AC M6-90° phase input N bending output) 16 mm OT-16 mm INPUT/AC M6-90° input PE bending Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13 BATTERY/ 2 x 6 OT-16 mm Battery – M6-90° bending BATTERY/ 2 x 6 OT-16 mm Battery PE M6-90° bending Torque for tightening M6 screws: 4.8 N·m Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 DC (12–20 bending battery) PCS of 12 BATTERY/ 2 x 6 OT-16 mm Battery – M6-90° batteries) bending BATTERY/ 2 x 6 OT-16 mm Battery PE M6-90° bending Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 M6: 4.8 N·m 6 mm OT-6 mm M6-90° bending OUTPUT DC (–) M6: 4.8 N·m 6 mm OT-6 mm M6-90° bending M6: 4.8 N·m 16 mm OT-16 mm M6-90° bending Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16: Unpacking And Checking

    ● Move the chassis with caution. Any bumping or falling may damage the equipment. After placing the equipment, unpack it carefully to prevent scratches. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17: Installing A Single Ups

    ● Lithium batteries are 3.6 U high and cannot be rounded up to 4 U. Install filler panels between lithium batteries and between the lithium battery and the UPS to fill the 0.4 U gap to meet the IEC 60297 standard. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18: Installing The Ups And Lead-Acid Batteries

    Procedure Step 1 Install mounting ears on both sides of the UPS. Figure 1-6 Installing UPS mounting ears Step 2 Install mounting ears on both sides of the battery. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19: Tower-Mounted Installation

    Step 3 Install the UPS and batteries with mounting ears on the rack, and then install the battery front panels. Figure 1-8 Installing the UPS and batteries ----End 1.2.2 Tower-Mounted Installation 1.2.2.1 Installing the UPS and Lithium Batteries Procedure Step 1 Assemble the support bases. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20 Step 2 Remove the mounting ears from both sides of the battery. Figure 1-10 Removing mounting ears Step 3 Place the UPS and batteries on the support bases. Figure 1-11 Placing the UPS and batteries Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21: Installing The Ups And Lead-Acid Batteries

    1.2.2.2 Installing the UPS and Lead-Acid Batteries Procedure Step 1 Assemble the support bases. Figure 1-13 Assembling a support base Step 2 Place the UPS and batteries on the support bases. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 NO TE For tower-mounted installation, you are advised to place batteries on the left side of the UPS. Step 3 Install rubber plugs. Figure 1-15 Installing rubber plugs ----End Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23: Installing Cables

    ● If no circuit breaker is installed for battery cables, install battery cables in the following sequence: ● 1. Install battery terminals on the UPS side. ● 2. Install battery terminals on the battery side. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24 (1) AC input power cable (2) AC output power cable Figure 1-17 Cable routes for a single UPS (tower-mounted) (1) AC input power cable (2) AC output power cable Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25 1 Installation and Cable Connection Cable Routes for the UPS and Lead-Acid Batteries Figure 1-18 Cable routes for a single UPS (rack-mounted) (1) AC input power cable (2) AC output power cable Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26: Installing Ac Power Cables

    ● For a single UPS, connect loads to AC OUTPUT SL and PL terminals. Connect primary loads to the SL terminal and secondary loads to the PL terminal. Use diagonal pliers to cut off the port baffle plates based on the actual situation. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27 Step 2 Remove the covers from the UPS wiring ports. Step 3 Install AC output power cables and then AC input power cables in sequence. Figure 1-21 Installing AC power cables (6 kVA single-phase input single-phase output) Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28: Installing Lithium Battery Cables

    Figure 1-22 Installing AC power cables (10 kVA single-phase input single-phase output) Figure 1-23 Installing AC power cables (10 kVA three-phase input single-phase output) ----End 1.2.3.3 Installing Lithium Battery Cables 1.2.3.3.1 Installing Power Cables for Lithium Batteries Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29: Installing Communications Cables For Lithium Batteries

    Figure 1-24 Installing battery cables (three batteries) ----End 1.2.3.3.2 Installing Communications Cables for Lithium Batteries Prerequisites NO TICE Do not use a parallel cable to directly connect the UPS to the battery parallel port. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30: Installing Lead-Acid Battery Cables

    Figure 1-25 Installing communications cables and parallel cables for lithium batteries (1) UPS (2) Lithium battery (3) Parallel cable for lithium batteries (4) Communications cable for lithium batteries ----End 1.2.3.4 Installing Lead-Acid Battery Cables Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31 Step 3 Tighten the screws at both ends of the battery terminals. Step 4 Reinstall the covers for the UPS wiring ports. Figure 1-26 Installing battery cables (two battery packs) Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32: Installing A Parallel System

    1.3 Installing a Parallel System UPS2000-H-(6 kVA–10 For details about how to install a parallel system, see the kVA) User Manual . 1.4 Connecting a Backfeed Protection Device 1.4.1 Backfeed Protection Device Specifications Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33 Requirements HONGFA: HF18FF/012 Contact type: normally closed (NC) Breaking capacity: 250 V AC, 5 A OMRON: MY2N-J DC12V Coil specifications: 12 V, rated current Panasonic: HJ2-L-DC12V < 1 A Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34: Feedback Protection Connections (With Dry Contract Control)

    1.5 Installing a 4G Module Procedure Step 1 Install the SNMP card in the optional card slot of the UPS and power on the UPS. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35 SNMP card IP address in the address box of the browser, select a Step 4 Enter https:// language, and enter the correct User Name and Password. The default user name is admin, and the preset password is Changeme. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36: Checking The Installation

    For details about how to connect to the cloud NMS, see Edge Data Center Management. ----End 1.6 Checking the Installation Table 1-7 Installation checklist Check Item Acceptance Criteria Cable routing Cables are routed properly according to engineering requirements. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37 The inside and outside of the cabinet are free from conductive dust or other sundries. Cable short circuits Check that cables are open-circuited using a multimeter or an insulation resistance tester. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38: Power-On Commissioning

    Devices are properly grounded. ● The voltage range of the UPS upstream input circuit breaker is 80–280 V AC (phase voltage), and the rated frequency is 50 Hz/60 Hz. 2.2 Lithium Battery Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39: Single Ups Operations

    Step 3 Press and hold the activate button on the front panel of each battery module for 5s to 10s. After the running indicator turns on, release the activate button to power on the lithium batteries. ----End 2.2.1.2 Initial Startup Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40: Installing The App

    Figure 2-2 Scanning the UPS QR code Step 2 (Optional) Select a display language. NO TE Figures provided in this document are for reference only. Figure 2-3 Selecting a display language Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Logging In To The App

    Figure 2-4 Downloading the app ● Download and install the NetEco app using a web browser. ● Download and install the NetEco app from Huawei AppGallery. ----End 2.2.1.2.2 Logging In to the App NO TE ● A maximum of two mobile phones can be connected to the WiFi network, and only one mobile phone can be used to log in to the app.
  • Page 42 Manually connect to WLAN Tap Manually connect to WLAN. The Select WLAN network screen is displayed. Select the UPS WiFi name whose last 20 digits are the same as the SN. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43 Step 5 After the WiFi connection is set up, the last 20 digits of the UPS WiFi name displayed on the app are the same as the SN on the UPS panel label. Tap Next to enter the UPS login screen. Figure 2-11 WiFi connected successfully Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44: Quick Settings

    Other parameters will not be restored. ----End 2.2.1.2.3 Quick Settings Step 1 After successful login, the Quick Settings screen is displayed. Verify parameters such as Voltage level(V), Frequency level(Hz), and Battery parameter settings Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45: Starting The Inverter

    Do not press any button during inverter startup. When the startup command is successfully delivered, and the inverter indicator is steady on, the UPS enters normal mode. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46: Powering On Loads

    Shutting Down the Inverter to Transfer the UPS to Bypass Mode Step 1 Shut down the inverter to transfer the UPS to bypass mode using one of the following methods. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47 Step 4 Switch off the mains AC input circuit breaker K1 and output circuit breaker Q1 of the UPS. After all indicators turn off and fans stop, the UPS shuts down, and the loads are powered off. ----End Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48: Cold-Starting The Ups Using Batteries

    In this way, the UPS stops supplying power through the output terminals immediately. ● The external EPO switch (switch or dry contact signal controlled by a switch) is provided by the customer. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49: Parallel System Operations

    PL terminal has no voltage output. NO TE When the mains is abnormal, the bypass output is disabled. As a result, the UPS SL terminal has no output voltage. ----End 2.3.1.2 Initial Startup Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50: Installing The App

    Figure 2-17 Scanning the UPS QR code Step 2 (Optional) Select a display language. NO TE Figures provided in this document are for reference only. Figure 2-18 Selecting a display language Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51: Logging In To The App

    Figure 2-19 Downloading the app ● Download and install the NetEco app using a web browser. ● Download and install the NetEco app from Huawei AppGallery. ----End 2.3.1.2.2 Logging In to the App NO TE ● A maximum of two mobile phones can be connected to the WiFi network, and only one mobile phone can be used to log in to the app.
  • Page 52 Manually connect to WLAN Tap Manually connect to WLAN. The Select WLAN network screen is displayed. Select the UPS WiFi name whose last 20 digits are the same as the SN. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53 Step 5 After the WiFi connection is set up, the last 20 digits of the UPS WiFi name displayed on the app are the same as the SN on the UPS panel label. Tap Next to enter the UPS login screen. Figure 2-26 WiFi connected successfully Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54: Quick Settings

    Verify the voltage level and frequency level based on site requirements. Set the battery type, single battery voltage, number of batteries in a battery string, single battery capacity, and number of battery strings based on site requirements. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55: Starting The Inverter

    Set the voltage level and frequency level based on site requirements. ● Set the battery type, single battery voltage, number of batteries in a battery string, single battery capacity, and number of battery strings based on site requirements. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56 The default voltage (V) string connected in series. value is 0. Set this parameter based on the actual configuration. This parameter is configurable in non- battery mode. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57 UPS enters normal mode. Method 2: In bypass mode, choose Config > Control > Power-on/off on the app to start the UPS. After successful startup, the UPS enters normal mode. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58: Powering On Loads

    Do not press any button during inverter shutdown. When the shutdown command is successfully delivered, and the inverter indicator is off, the UPS shuts down the inverter output and enters bypass mode. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Cold-Starting The Ups Using Batteries

    UPS enters the standby state (the WiFi indicator is on and the fault indicator blinks). Hold down the UPS button for more than 5s, and the UPS enters battery mode. Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60: Performing Epo

    ● The external EPO switch (switch or dry contact signal controlled by a switch) is provided by the customer. 2.3.2 Parallel System Operations UPS2000-H-(6 For details about how to commission a parallel system, see the kVA–10 kVA) User Manual . Issue 01 (2022-06-30) Copyright © Huawei Digital Power Technologies Co., Ltd.