Stand-Off Assembly And Installation - kozy heat CALLAWAY 50 MV Installation And Operation Manual

Direct vent gas fireplace
Table of Contents

Advertisement

3.3 Stand-off
Assembly and Installation
NOTE: If installing a heat transfer kit(s), please reference the manual
included with the kit.
WARNING: The top stand-offs brackets provide the required minimum
clearance to the header. The clearance to header must be maintained.
See FIGURE 3.3 below for installation
Stand-off brackets must be formed and attached prior to positioning
fireplace into framed opening.
FIGURE 3.3 Stand-off Assembly and Installation
HUSSONG MFG. CO., INC.
KOZY HEAT FIREPLACES
1.
Remove and save (4) screws securing the stand-off brackets on
top of the fireplace.
2.
Form each stand-off bracket by bending at perforations,
as shown.
3.
Align the holes in the formed stand-off brackets with the
holes on top of the fireplace. Secure with (4) screws previously
removed along with (4) screws provided in the fireplace
components packet.
4.
Remove and save screws securing the back stand-off brackets.
Form the back stand-off heat shields as shown. Secure using
provided screws.
ALL DESIGN OPTIONS INSTALLATION
SECTION 3 FRAMING

Stand-off Assembly and Installation

13
#CLW-50-MV
R.1 October 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clw-50-mv

Table of Contents