Nailing Flange Assembly And Installation - kozy heat CALLAWAY 50 MV Installation And Operation Manual

Direct vent gas fireplace
Table of Contents

Advertisement

3.2 Nailing Flange
Assembly and Installation
CAUTION: Never permanently remove these assemblies from the
fireplace—they must be secured regardless of finish material used.
Refer to FIGURE 3.2 below for nailing flange installation.
1.
Remove (2) nailing flanges from the right and left side of the
fireplace.
2.
Align nailing flange with holes on outside corners of fireplace,
with the stand-off flanges on the nailing flanges facing away
from the fireplace.
Stand-o
ange
FIGURE 3.2 Nailing Flange Installation
12
#CLW-50-MV
R.1 October 2021
BACK VIEW
Nailing ange installed
Nailing ange as
shipped
TOP VIEW
Framing stud
2½"
(64mm)
Clearance
Nailing ange
3.
Secure the nailing flanges to the fireplace with screws (provided)
through the slots in nailing flanges.
4.
Bend perforation on nailing flange until parallel with fireplace
face. Do not bend toward fireplace face.
5.
UNTIL ALL FRAMING REQUIREMENTS ARE COMPLETED:
Position framing stud against the small stand-off (located on
backside of nailing flange). Secure with nails or screws.
When installed, the nailing flanges provide the minimum
2½" (64mm) clearance from the sides of the fireplace
to framing.
FRONT VIEW
FRONT VIEW
Stand-o
ange
ALL DESIGN OPTIONS INSTALLATION
HUSSONG MFG. CO., INC.
SECTION 3 FRAMING

Nailing Flange Assembly and Installation

Nailing ange
installed
Nailing ange
Framing stud
KOZY HEAT FIREPLACES

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clw-50-mv

Table of Contents