Stand-Off Assembly And Installation - kozy heat SP-41-L Installation And Operation Manual

Direct vent gas fireplace
Table of Contents

Advertisement

3.4 Stand-Off Assembly and Installation

WARNING: The top stand-offs provide the 3-
1/2" (89mm) minimum clearance to the header. The
1" (25mm) top stand-off flange accommodates
1/2" (12mm) combustible facing material (sheetrock).
The clearance to hear must be maintained
Top stand-off brackets must be formed and attached
prior to positioning fireplace into framed opening.
Installation:
1. Remove and save (4) screws securing stand-off
brackets on top of the fireplace.
2. Form each top stand-off bracket by bending at
perforations, as shown.
3. Align the holes in the formed top stand-offs with
the holes in the fireplace top. Secure with the (4)
screws previously removed.
Hussong Mfg. Co, Inc.
SP-41, PFS Report No. 19-561
Figure 3.1 - Stand-Off Installation
12
Rev. 9 - November 2023
Starting Serial Number: 23 96397 XX

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sp-41-mv

Table of Contents