Installing The Monitor - ABB 7320 Series Instruction Manual

Dissolved organics monitor
Table of Contents

Advertisement

...2 MECHANICAL INSTALLATION
2.2 Installing the Monitor – Figs. 2.2 and 2.3
Dimensions in mm (in.)
4 x ø 9.5 (
3 /
8
for M8 fixing
Mark-out the fixing centers of the
1
four mounting holes – see Fig. 2.2.
3
Fix the instrument
securely to the wall.
4
) holes
Fixing Centers
227 (8.9)
252 (9.9)
Fig. 2.2 Overall Dimensions
Fig. 2.3 Monitor Fixing Details
150 (5.9)
5 (0.2)
133 (5.2)
Drill suitable holes for the type
2
of fixings to be used.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7320 0007320 1007320 2007320 300

Table of Contents