Out Of Sample Alarm Input Connections; Alarm Relay Connections; Out Of Service Alarm; Selecting The Mains Voltage - ABB 7320 Series Instruction Manual

Dissolved organics monitor
Table of Contents

Advertisement

3.3.1 Out of Sample Alarm Input Connections

A digital input is supplied which can be connected to a low flow
indicator or sump level switch. This can be used to give
indication of the loss of the sample flow or an unacceptable
drop in water level. The input is linked to the internal system
relay when selected in the program.
The input can be configured in the software to accept an input
from a device which has normally open or closed contacts –
see Section 5.5.
If this input is not required, leave it open circuit.

3.3.2 Alarm Relay Connections

Up to two alarm relays can be provided with connections to the
single set of contacts for each alarm – see Fig. 3.3. Alarms can
be connected using suitable signal cable.
The operating sense of the relays can be changed using the
service programs – see Section 5.6, Set Up Outputs. This
enables normally open or normally closed configurations.
Handbag link
Identify the mains tappings on the 2
p.c.b's and select the required mains
voltage using the links supplied.
Note. For 110 V both 110 V
tappings on each board MUST be
linked. Spare links for this purpose
are packed with the spare fuse.
Caution. Support the cover during the
unlocking procedure to prevent it falling and
possibly damaging the ribbon cable and/or p.c.b.
Unlock and carefully remove the upper
1
enclosure cover.
1
3
4
Offer the cover up to the enclosure and reconnect the
ribbon cable
5
Replace and lock secure the upper enclosure cover
Fig. 3.4 Selecting the Mains Voltage
3 ELECTRICAL CONNECTIONS

3.3.3 Out of Service Alarm

This alarm can be remotely transmitted via an internal relay
provided. This is a fail-safe relay which is de-energised in the
event of a diagnostics alarm – see Section 6.3.1 for details.
3.4 Selecting the Mains Voltage – Fig. 3.4

3.5 Start Up

When all sample/drain connections have been made and
electrical/signalling installation has been completed and
checked, switch on the power supply.
Proceed to Section 5 for programming details.
Disconnect the front panel ribbon
2
cable at the main p.c.b. end.
3
2
4
Fuse no. 5 (see Fig. 3.3)
Fuses
No.
Function
Rating
1
Mains in
500 mA
2
24 V out
1 A
3
Mains in
500 mA
4
12 V out
1 A
5
Mains in
500 mA
The cover may be
supported using the
earth cable.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

7320 0007320 1007320 2007320 300

Table of Contents