Pre-Maintenance Procedures
Preparing for Maintenance
1.
Park the machine on a level surface, press the
enable/disable switch to the D
lower the cutting units, and engage the parking brake.
2.
Shut off the engine, remove the key, and wait for all
moving parts to stop.
3.
Wait for the engine to cool.
Opening the Hood
1.
Release the 2 hood latches
Figure 96
1. Hood latch (2)
2.
Rotate open the hood.
and position,
ISENGAGE
(Figure
96).
g369009
Closing the Hood
1.
Carefully rotate the hood closed
1. Hood latch (2)
2.
Secure the hood with the 2 hood latches.
Opening the Screen
1.
Remove the ball pin from the screen latch
1. Ball pin
2.
Unlatch and open the screen.
Closing the Screen
1.
Close and latch the screen
52
(Figure
97).
Figure 97
(Figure
Figure 98
2. Screen latch
(Figure
99).
g369219
98).
g378175