8. Route and connect the data cable.
9. If needed, install an optical drive ( Installing an 8 SFF optical drive ).
10. Install the access panel ( Install the access panel ).
11. Install the server in the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server (Power up the server ).
Installing an 8 SFF display port/USB/optical blank option
87