9. Install the expansion board.
10. Connect any required internal or external cables to the expansion board.
11. Install the access panel ( Install the access panel ).
12. Install the server in the rack.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server .
Installing an expansion board in the secondary riser cage
105
Need help?
Do you have a question about the HPE ProLiant DL365 Gen10 Plus Server and is the answer not in the manual?