Install the primary PCI riser cage
Install the primary PCI riser cage
Procedure
Procedure
1. Install the PCI riser cage.
2. Install the access panel ( Install the access panel ).
3. Install the server into the rack (Installing the server into the rack ).
4. Connect each power cord to the server.
5. Connect each power cord to the power source.
6. Power up the server (Power up the server ).
Install the primary PCI riser cage
41
Need help?
Do you have a question about the HPE ProLiant DL365 Gen10 Plus Server and is the answer not in the manual?
Questions and answers