13. Install the primary PCI riser cage.
14. Install the access panel ( Install the access panel ).
15. Install the server in the rack.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server (Power up the server ).
19. Install drives.
Installing a 2 SFF NVMe drive cage option
85