10. Install the following, as needed:
Expansion boards (Installing an expansion board in the primary riser cage )
GPU (Installing an accelerator or GPU in the primary riser cage )
Controllers (Smart Array controller options )
11. Install the riser cage ( Install the primary PCI riser cage ).
12. Install the access panel ( Install the access panel ).
13. Install the server in the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server (Power up the server ).
Installing an optional primary PCI riser board
90
Need help?
Do you have a question about the HPE ProLiant DL365 Gen10 Plus Server and is the answer not in the manual?