JDS Uniphase T-BERD ⁄ MTS 5800 Series Getting Started Manual page 89

Handheld network test
Table of Contents

Advertisement

Chapter 4 Basic Testing
Running multiple tests
If a second test is active when viewing both tests, the display
will look similar to
Figure
29.
Figure 29 Dual Test view with two active tests
The buttons included in each side represent the buttons avail-
able for that test. For example, pressing the Restart on the left
side restarts the DS3 BERT test; similarly, pressing the Show
Actions button on the right will display the actions related to
the 100M optical Layer 3 Traffic test, such as "Start Traffic" or
"Insert Errors".
If you want to simultaneously restart both tests, use the
Restart Both Tests button in the upper right.
Use the Test menu to save the dual test configurations or to
load a previously saved dual test configuration.
Use the Reports menu to save (create) a dual test report or
to view a previous report.
67
T-BERD/MTS 5800 Getting Started Manual

Advertisement

Table of Contents
loading

Table of Contents