JDS Uniphase T-BERD ⁄ MTS 5800 Series Getting Started Manual page 84

Handheld network test
Table of Contents

Advertisement

Chapter 4 Basic Testing
Running multiple tests
Table 4
Multiple Test Restrictions
Application
Dual thru
IPv6
L3 Triple Play
DS1 Signaling
VF test
PRI ISDN
Any other application at
a line rate less than
10 Gbps
10 Gbps
applications
10 Gbps Packet Capture
Ethernet: Multiple
Streams
62
Table 4
lists the applications that are limited to a single test,
or should be run at lower temperatures.
Restriction
You can only run one Dual thru test.
Additional tests can not be run when running an IPv6
test.
Additional tests can not be run when running a layer 3
Triple Play test.
Additional tests can not be run when running a DS1 Sig-
naling test.
Additional tests can not be run when running a VF test.
Additional tests can not be run when running a PRI
ISDN test.
When running any application at a line rate less than
10 Gbps, you can run one additional test at a line rate
less than 10 Gbps while operating the instrument at:
– 32°F to 104°F (0°C to +40°C)
When running a 10 GigE Ethernet, OC-192, or STM-64
test, you can run one additional test (at a lower line rate)
while operating the instrument at:
– 32°F to 95°F (0°C to +35°C)
When running a 10 GigE LAN or WAN application, and
capturing data on Port #1, you can not run a 1 GigE
application from Port #2. If you want to run a 1 GigE
application on Port #2, you must first disable packet
capture for the 10 GigE application running on Port #1.
You can run applications for lower line rates (for exam-
ple, 10/100/10000 Mbps Ethernet) on Port #2 when cap-
turing packets on Port #1 for a 10 GigE application.
Two Multiple Streams applications can not be run simul-
taneously.
T-BERD/MTS 5800 Getting Started Manual

Advertisement

Table of Contents
loading

Table of Contents