Assembly Preparation; Setting Up And Connecting The Storage Cabinet - Varta element backup 6 Operating Manual

Hide thumbs Also See for element backup 6:
Table of Contents

Advertisement

11.10

Assembly preparation

This section is directed towards the electrical specialist.
Read the operating manual.
Components are heavy.
This can lead to overburdened intervertebral discs, contusions and strains.
At the setup site, tilt cabinet maximum 30°
à Danger of slippage!
11.11

Setting up and connecting the storage cabinet

No.
1
2
3
4
5
6
7
52
WARNING
Carry out the works described in this chapter with 2 persons or suitable aids.
Figure 3: Back of storage cabinet
Description
Network connection (house network)
Replacement power connection (light grey)
Optional:
Demand response enabling device (DRED)
PV sensor (RJ12 socket)
Grid sensor (RJ12 socket)
LAN (RJ45 socket)
Wall fastening

Advertisement

Table of Contents
loading

Table of Contents