Activate Replacement Power Function; Guarantee - Varta element backup 6 Operating Manual

Hide thumbs Also See for element backup 6:
Table of Contents

Advertisement

4.5

Activate replacement power function

The parameters of the replacement power supply can be set in the Energy Manager tab
The replacement power function of the store is activated in field (3).
Note on the replacement power function for cascade mode:
In cascade mode, only one energy store can be used to supply replacement power. If the replacement power
function is activated on several energy stores, no energy store will supply replacement power.
Replacement power reserve
The storage system is discharged up to this charging status in the integrated network mode. The capacity set in
field (4) is reserved for the supply in the event of a power failure. Values between 0% - 30% SOC can be set here.
Notes on setting the value:
The value is a weighting between capacity for own consumption optimisation and supply duration in the event
of a power failure. The smaller the set reserve capacity, the greater the capacity that can be used for the
normal own consumption optimisation. At the same time, however, the capacity reserved for a power failure is
smaller.
5

Guarantee

For the guarantee to become effective, the following data must be held by VARTA Storage:
Serial number (SN number) of the VARTA system,
Serial number of the battery module(s),
Name and email address of the end customer.
These data are stored by the installer in the installer portal of VARTA Storage.
Carry out the guarantee registration of the
installation of the energy store.
The battery module(s) is/are to be installed by the installer 20 weeks after
25
1
Replacement power button
2
Information
3
Replacement power function
active / inactive
4
Replacement power reserve
energy store
Replacement power
four weeks
within
following the
delivery
(1).
at the latest

Advertisement

Table of Contents
loading