11.8

Network connection preparation (black plug)

For the network connection, the 5-wire network connection line must be connected to the
plug connection (black plug) provided
Strip the connection line 40mm at the end.
The PE conductor must be 5mm longer than the other four conductors (L1, L2, L3, N). Shorten these
conductors accordingly.
Strip the five wires of the house connection at the ends 8mm.
In the case of fire-wired conductors, wire terminations are to be used.
Unscrew the cap nut of the tension relief.
Remove the plug housing: To this end, release the catch by pressing the two side detents
simultaneously.
Slide the cap nut and the plug housing over the line.
i
A flexible, non-metallic sheathed cable facilitates the mounting work.
47
No.
Description
1
Cap nut for tension relief
2
Plug housing
Opening for latching when inserting
3
To release: Press in detent
4
Contact insert
Opening for detent (two-sided).
5
For latching when mounting the plug