5.0
TD-107
Oil Content Monitor
Operation Manual
INSTALLATION CHECKLIST
To Do
Complete
INITIAL REQUIREMENTS -- WATER ENGINEER
1.
2.
INSTALLATION REQUIREMENTS -- WATER ENGINEER
1.
2.
3.
4.
CUSTOMER REQUIREMENTS – PLUMBER
1.
2.
3.
CUSTOMER REQUIREMENTS – ELECTRICIAN
1.
2.
3.
FINAL REQUIREMENTS -- WATER ENGINEER AND CUSTOMER
1.
2.
Customer Responsibilities: This checklist outlines work required prior to start-up. This
work is necessary to ensure quality and proper operation. However, if any of these
requirements cannot be met, contact NAG Marine.
Requirements
Ensure turbidity is less than 50 NTU. (NOTE: Install appropriate
filter/strainer on inlet if required).
Assure bilge water temperatures of 32–140
Locate unit within 25 ft [7.62 m] from sample point.
Locate unit out of direct sunlight.
Locate unit where ambient temperatures are 40–120 °F [4–49 °C].
Locate unit at least 10 ft [3.05 m] from devices such as large generators,
which require a great deal of electrical power, or generate a strong
electromagnetic field.
Sample stream must be plumbed to the unit to deliver at a rate greater
than 0.13 U.S. gal/min [0.5 L/min], less than 1.0 U.S. gal/min [3.78 L/min]
and less than 100 psig [689.5 kPa(g)]. One 0.25 in. FNPT pipe
connections is provided for pipe inlet hook-up. One ¼ inch Swagelok is
provided discharge water (see General Arrangement Drawings). NAG
Marine recommends flex lines for the inlet/outlet connections. Ensure
sampling point avoids air entrapment.
Sample from side of water line to avoid air entrapment (if appropriate).
Provide free, unrestricted drain for sample stream if possible.
Ensure environment will support a NEMA 4-type enclosure.
Provide continuous 20–240 VAC/VDC, 50/60 Hz, 15 watt electrical
5.0
service to the TD-107
Connect the High Signal (5 ppm) Alarm Relay to the bilge water treatment
system diverter valve.
Connect the separator system status input and flow status input to the
5.0
TD-107
OCM.
If the unit is to be installed by a third party arrange a time during start-up
when you and the customer can be trained together.
Obtain needed materials (check solution, 0 ppm clean water, cleaning
solutions, accessory kit, and flow-cell cleaning brushes) prior to
commissioning the System.
32
°
F [0–60
OCM.
°
C].