AMU Powercon
Installation
2.4.2
2.5.
A-96.250.331 / 230320
FEP Tube at Sample Outlet
FEP flexible tube 6 mm
A
Ellbow union
A
B
Compression ferrule
C
Knurled nut
B
D
Flexible tube
C
D
Connect the tube to the Serto elbow union and Insert it into an at-
mospheric drain of sufficient capacity.
Max. tube length is 1.5 m. Do not connect longer tubes.
Install the Conductivity Sensor
A
B
C
D
1 Make sure that the locking mechanism is in unlocked position
(locking pin in position [G] and security screw in position [H]).
2 Put the sensor into the flow cell with the alignment marks [E] in
line.
3 Turn the locking screw with a 5 mm allen key clockwise 180°.
The locking pin moves up in lock position.
A
Blind plug
B
Locking pin locked
C
Locking screw closed
D
Flow cell
E
Alignment marks
E
F
Conductivity sensor
G
Locking pin unlocked
F
H
Locking screw open
G
E
H
15