Installation; Installation Checklist - Swann AMU Powercon Operator's Manual

Version 6.20 and higher
Table of Contents

Advertisement

AMU Powercon

Installation

2.
2.1.
Check
Installation
Electrical con-
nections
Power-up
Instrument
setup
Run-in period
10
Installation

Installation Checklist

Instrument's specification must conform to your AC power ratings.
Do not turn on power until instructed to do so.
The transmitter is intended for panel mounting. The dimensions
are shown under
Dimensions of the AMU Transmitter, p.
Connect all external devices, see
Connect the power cord, but do not switch on power until all exter-
nal devices are connected.
Open sample flow and wait until flow cell is completely filled.
Switch on power.
Adjust sample flow.
Program all sensor parameters see
Program the required temperature compensation.
Program all parameters for external devices (interface, recorders,
etc.).
Program all parameters for instrument operation (limits, alarms).
If the conductivity value of the sample is very low, the sensor might
need some time until the correct reading is displayed.
Electrical Connections, p.
Sensor parameters, p.
A-96.250.331 / 230320
11.
17.
23.

Advertisement

Table of Contents
loading

Table of Contents