Gechter HKPL-DS Translation Of The Original Operating Manual page 83

Hand lever press with air assistance
Table of Contents

Advertisement

Loosen the pin retaining screw in the clamped piece
Loosen the clamping screw
Insert the PTE (Gechter lettering to the front).
Assemble the PTE
1
2
Release the threaded pin
Adjust the depth according to the scale
Tighten the threaded pin
Adjusting the PTE
HKPL-DS
Translation of the original operating manual
Setup and accessories
Pin retaining screw
Clamping screw
1
2
3
3
Precision depth stop PTE
76
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hkpl-msHkpl-mc

Table of Contents