Beater Rotation - Taylor 632 Operator's Manual

Combo freezer
Table of Contents

Advertisement

IMPORTANT! This machine is provided with
an equipotential grounding lug that is to be properly
attached to the rear of the frame by the authorized
installer. The installation location is marked by the
equipotential bonding symbol (5021 of IEC 60417-1) on
the removable panel and the frame.
NOTICE!
Stationary machines which are not equipped
with a power cord and a plug or another device
to disconnect the machine from the power
source must have an all-pole disconnecting
device with a contact gap of at least 0.125 in. 
(3 mm) installed in the external installation.
Machines that are permanently connected to
fixed wiring and for which leakage currents may
exceed 10 mA, particularly when disconnected
or not used for long periods, or during initial
installation, shall have protective devices to
protect against the leakage of current, such as a
GFI, installed by the authorized personnel to the
local codes.
Supply cords used with this machine shall be oil-
resistant, sheathed flexible cable not lighter
than ordinary polychloroprene or other
equivalent synthetic elastomer-sheathed cord
(code designation 60245 IEC 57) installed with
the proper cord anchorage to relieve conductors
from strain, including twisting, at the terminals
and protect the insulation of the conductors
from abrasion.
If the supply cord is damaged, it must be
replaced by the manufacturer, service agent, or
a similarly qualified person, in order to avoid a
hazard.
To the Installer
All manuals and user guides at all-guides.com
Model 632

Beater Rotation

NOTICE! Beater rotation must be clockwise as
viewed looking into the freezing cylinder.
Note: The following procedures must be performed by
an authorized Taylor service technician.
To correct the rotation on a three-phase machine,
interchange any two incoming power supply lines at
freezer main terminal block.
To correct rotation on a single-phase machine,
change the leads inside the beater motor. Refer to
the diagram printed on the motor.
Electrical connections are made directly to the terminal
block provided in the main control box located behind the
service panel.
TO THE INSTALLER
1-3
1

Advertisement

Table of Contents
loading

Table of Contents