Installation Prerequisites
Installation Prerequisites
When installing your C3K switch, note the following:
•
Before starting the installation procedure, notify your network administrator of the
installation.
•
Follow the installation procedures in the order as presented in this guide.
•
Do not connect the switch to the network until you have established the correct IP address.
Necessary Tools
A Phillips screwdriver is required for some installation procedures.
Unpacking the C3K Switch
Unpack the switch as follows:
1.
Open the carton and remove the packing material protecting the switch.
2.
Verify the carton contents with the items listed in Table
Table 2-1 Contents of Switch Carton
Item
C3K series switch
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting)
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country dependent.)
DB9 female-to-DB9 female management console cable
Customer Release Notes
URL notice card
Quick Reference Guide
3.
Remove the tape seal on the non‐conductive bag to remove the switch.
4.
Perform a visual inspection of the switch for any signs of physical damage. Contact
Enterasys Networks if there are any signs of damage. See "Getting Help" on page xvii for
more information on contacting Enterasys Networks.
2-2 Hardware Installation
2‐1.
Quantity
1
1
4
1
1
1
1
1