Installation; Installation Diagram; Figure 4 Installation Diagram - Metrohm 942 Extension Module Vario LQH Manual

Hide thumbs Also See for 942 Extension Module Vario LQH:
Table of Contents

Advertisement

3.1 Installation diagram

3 Installation

3.1
Installation diagram
1
Connection to a Dosino
3
Sample aspiration capillary
5
Capillary to the waste container
■■■■■■■■
10
Depending on the application, the peristaltic pump, injection valve and
10-port valve of the 942 Extension Module Vario LQH can be installed dif-
ferently.
The installation shown below only represents one of many possible instal-
lation setups. The graphic arrangement of the modules corresponds to the
front of the Extension Module. The liquid containers and components of
the IC instrument are not shown in the diagram.
Figure 4
Installation diagram
2
Transfer tubing connection – 10-port
valve
The transfer tubing is connected to the cen-
tral port of the 10-port valve.
4
Peristaltic pump connection – Injection
valve on the extension module
6
10-port valve connection – Injection
valve on the extension module
942 Extension Module Vario LQH (2.942.0070)
■■■■■■■■■■■■■■■■■■■■■■

Advertisement

Table of Contents
loading

This manual is also suitable for:

2.942.0070

Table of Contents