Firebrick Installation Instructions - Pacific energy ALDERLEA T6 Installation & Operation Manual

Hide thumbs Also See for ALDERLEA T6:
Table of Contents

Advertisement

Firebrick Installation Instructions

This package contains 19 full-size firebricks, as well as 5 various cut bricks.
With the woodstove in the upright position, install firebricks as follows:
1. Place the firebricks on the bottom of the unit first. Use a total of 6 full-size (D)
and 5 cut bricks (A, B, C & 2E) with ash cleanout system.
2. Next install the side firebricks, 3 full-size and 2 cut firebricks(F) on each side
of the firebox as shown.
3. Finally install 4 full-size bricks against the rear wall as shown.
ITEM
SIZE
A
1 1/2" X 4 1/2" X 1 1/4"
B
4" X 4 1/2" X 1 1/4"
C
7 1/4" X 4 1/2" X 1 1/4"
D
9" X 4 1/2" X 1 1/4"
E
9" X 4 1/2" X ANGLED CUT
F
9" X 3 1/2" X 1 1/4"
D
190617-24 AL6B
(39 mm x 115 mm x 32 mm)
(102 mm x 115 mm x 32 mm
(184 mm x 115 mm x 32 mm)
(230 mm x 115 mm x 32 mm)
(230 mm x 115 mm (cut) x 32 mm)
(102 mm x 115 mm x 32 mm)
F
A
B
E
C
©PACIFIC ENERGY FIREPLACE
19
PRODUCTS LTD.
F

Advertisement

Table of Contents
loading

Table of Contents