Installation Procedure - Mobile Home - Pacific energy ALDERLEA T6 Installation & Operation Manual

Hide thumbs Also See for ALDERLEA T6:
Table of Contents

Advertisement

Installation Procedure – Mobile Home
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND
CEILING/ROOF MUST BE MAINTAINED.
BOTH CHIMNEY SYSTEM AND CONNECTOR MUST BE LISTED TO: IN
CANADA - ULC S-641 LISTED CONNECTOR AND ULC-S-629 LISTED
CHIMNEY, IN USA - UL-103 HT LISTED CONNECTOR AND CHIMNEY
Note: See "Combustion Air" section on page 12.
1.
Position stove and floor protection with hole for combustion air in accordance with the
clearances as stated on the label and in Figures #3.
2. Mark the position for the hole in the ceiling and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with floor joists, ceiling joists or rafters
before proceeding further.
4. Cut a hole in the ceiling and roof to suit the chimney system and frame in the sides. The
chimney support is mounted to the framing.
5. Assemble chimney sections so the finished length is resting on the support and protruding
through the roof. Avoid having joints between ceiling and roof. Install radiation shield.
Assemble flashing and storm collar and be sure to maintain the vapour barrier at this
point. (Seal securely.) Attach rain cap and check flashing for leaks.
5. Install connector as per manufacturer's instructions.
6. To attach stove to floor, first remove the leveling bolts from the legs. Then attach stove
to flooring using two 1/4" x 2" or longer lag screws through the leveling bolt holes.
190617-24 AL6B
©PACIFIC ENERGY FIREPLACE
11
PRODUCTS LTD.
Follow chimney and chimney
components manufacturer's
instruction for assembly and
installation.

Advertisement

Table of Contents
loading

Table of Contents