Advertisement

IMPORTANT:
THESE INSTRUCTIONS ARE TO
REMAIN WITH THE HOMEOWNER.
PLEASE SAVE THESE INSTRUCTIONS.

SAFETY NOTICE

If this stove is not properly installed, a
house fi re may result. For your safety,
follow the installation instructions. Contact
local building or fire officials about
restrictions and installation inspection
requirements in your area.
TESTED and LISTED to CAN/ULC S627
AND UL 1482
Meets the Environmental Protection
Agency's July 1990 Particulate Emission
Standards
091013-20
INSTALLATION
AND OPERATING
INSTRUCTIONS
MODEL:
SUMMIT
SUMMIT CLASSIC
SERIES-B
SUMMIT-B
SERIAL #
5055.3252

Advertisement

Table of Contents
loading

Summary of Contents for Pacific energy SUMMIT

  • Page 1: Safety Notice

    TESTED and LISTED to CAN/ULC S627 AND UL 1482 Meets the Environmental Protection Agency's July 1990 Particulate Emission Standards MODEL: SUMMIT SUMMIT CLASSIC SERIES-B 091013-20 SUMMIT-B 5055.3252...
  • Page 2: Table Of Contents

    Understanding & Operating Your Pacifi c Energy Stove ......14 may result in property damage, bodily Replacement Parts ................15 injury, or even death. Replacement Parts - Summit Classic ...........16 Pedestal or Legs Installation Instructions ..........17 Firebrick Installation Instructions ............18 Label .....................19...
  • Page 3: Safety And Maintenance

    . Be careful as they are very sharp. Install new glass complete with gasket. Replace frame, clamps and screws. CAUTION: - do not overtighten, tighten screws very carefully - do not clean glass when hot - do not use abrasive cleaners on glass SUMMIT-B 091013-20...
  • Page 4: Maintenance Checks

    - Replace if the baffle has permanent warping greater than this or has cracking or breakage. - Please contact your Dealer if you experience any of the damage listed above. Continuing to operate your stove with broken parts may accelerate damage to other parts and may void your warranty SUMMIT-B 091013-20...
  • Page 5: Creosote

    Proper clearances are critical during such a fi re. Chimney fi res are easy to detect; they usually involve one or more of the following: -Flames and sparks shooting out of the top of the chimney -A roaring sound -Vibration of the chimney SUMMIT-B 091013-20...
  • Page 6: Minimum Clearance To Combustibles

    (removable cover facing up) with the holes on the stove. 2) Position the legs over top of the same holes on the stove. 3) Secure in place with 1" x 1/2" bolts previously removed. 4) Carefully place the unit in the upright position. SUMMIT-B 091013-20...
  • Page 7: Mobile Home Installation

    #3, Page 7). Install all components to the connector or chimney manufacturer's installation requirements. Consult your chimney supplier for installation advice. 25 1/2" 27 7/8" 23 1/2" 8 1/2" Pacifi c Summit - Pedestal Model 31 1/2" 30" 27 1/2" 23 5/8" 25 3/8"...
  • Page 8: Listed Chimney And Chimney Connector

    CL48 SDP-P SDT-P 2' Chimney length T-24 HS 24 CL24 SDP-P SDT-P Roof fl ashing RF17 T-SFA 8RFFU SDP-F SDT-F Storm collar T-SC TGSC PL-ASCG SDP-SC SDT-SC Spark arrestor rain cap XCPE RCSA RCSA T-CT 6PL-MPC SDP-C SDT-C SUMMIT-B 091013-20...
  • Page 9: Residential Installation

    Do not connect this unit to a chimney fl ue serving another appliance. Minimum system height is 15 feet (4.6 m.) (measured from base of appliance). Double-Wall Connector Use a listed double-wall connector. Install all components to the chimney connector manufacturer's installation requirements. SUMMIT-B 091013-20...
  • Page 10: Floor Protector

    During extremely cold weather, and especially when burning at very slow rates, the upper parts of the exposed chimney may ice up, partially blocking the fl ue gases. If blockage occurs, fl ue gases may enter living space. 16" [406mm] SUMMIT-B 091013-20...
  • Page 11: Operation

    4. After the fi re has established itself, open the door and add a few small logs. Close door. Your PACIFIC ENERGY heater is designed for maximum overall 5. Begin normal operation after a good coal base exists and wood efficiency at a moderate fi ring rate.
  • Page 12: More Wood, More Heat

    If the ashes are disposed of by burial in soil or otherwise locally dispersed, they should be retained in closed container until all cinders have thoroughly cooled. Other waste should not be placed in this container. SUMMIT-B 091013-20...
  • Page 13: Optional Blower

    1. Combustion air supply blocked - Check outside air supply for obstruction - Check that room air cover is removed 2. Draft too low - Chimney plugged or restricted, inspect and clean - Chimney oversized or otherwise unsuitable, consult Dealer SUMMIT-B 091013-20...
  • Page 14: Understanding & Operating Your Pacifi C Energy Stove

    1 -Boost Air 4 -Secondary Combustion Zone 2 -Main Combustion Air 5 -Radiant Heat 3 -Air Wash System 6 -Convected Heat SUMMIT-B 091013-20...
  • Page 15: Replacement Parts

    19 ..Pedestal Assembly ........SUMB.3147 20..Pedestal Front Cover ......SUMM.32075 21..Ash Dump Assembly ......WODC.2261 All parts may be ordered from your nearest Pacifi c Energy dealer. Contact Pacifi c Energy for the location of the dealer nearest you. DR46.XX SUMMIT-B 091013-20...
  • Page 16: Replacement Parts - Summit Classic

    Replacement Parts - Summit Classic ITEM DESCRIPTION PART NO. ITEM DESCRIPTION PART NO. 1.... Top Panel ........SUCA.3251XXA 23..Leg Adapter (Leg Model) ....SUMB.LGADA 2.... Screen Trivet ........CLAD.CTXXA 24..Leg, Black........... CAST.LEGXX 3.... Side Shield ........SUCA.3253XXA 4.... Door Catch ........WODC.1461A 5....
  • Page 17: Pedestal Or Legs Installation Instructions

    Super 27 and Pacifi c Summit Pedestal or Legs Installation Instructions Required: Pedestal Kit Leg Adapter Pedestal base Ash drawer enclosure Front cover (attached) Front cover (attached) 1/2" washers with Leg Set Legs NOTE: Optional ash dump kit should be installed prior to pedestal or leg kit assembly.
  • Page 18: Firebrick Installation Instructions

    Firebrick Installation Instructions Pacifi c Summit and Summit Classic Wood Stove This package contains 17 full-size fi rebricks, as well as 7 various cut-size bricks. If your heater came with an ash cleanout system, or an optional one is being in- stalled, one brick (D) will not be needed for your installation.
  • Page 19: Label

    Label LABEL LOCATION MUR ADJACENT MUR COTE SIDE WALL ADJACENT WALL COTE SIDE SUMMIT-B 091013-20...
  • Page 20 PACIFIC ENERGY FIREPLACE PRODUCTS LTD. 2975 Allenby Rd., Duncan, B.C. V9L 6V8 Phone: 250-748-1184 Web site: http://www.pacifi cenergy.net Printed in Canada...

This manual is also suitable for:

Summit classicSeries-b

Table of Contents