Maintenance Forecast; Start; Forecast (Battery) - Mitsubishi Electric R56TB Instruction Manual

Industrial robot
Table of Contents

Advertisement

16.5. Maintenance Forecast

In Maintenance Forecast, the parts replacement (grease replenishment, battery and belt replacements) times
can be checked from the up-do-date operating data collected inside the controller.
16.5.1.

Start

Tap [Maintenance Forecast] button on Maintenance menu. The Maintenance Forecast window appears.
16.5.2.

Forecast (Battery)

When the information for Maintenance Forecast has been loaded from the controller, the following window
appears.
If the battery remaining time has reached
(Remaining time) < [The remainder days until presumed maintenance time] on the Setup screen)
, the hours and bar graphs are displayed in orange.
(The battery replacement time is calculated during the time when the controller's power is not on.)
This item is not displayed when connecting with CR800 series robot controller.
When the [Refresh] button is tapped on in upper-right corner of the window, the information about the
maintenance is acquired again from the controller.
x (24 - [Operation time of a day])
131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr750 seriesCr751 seriesCr800 seriesR57tb

Table of Contents