The control box must be connected to a supply fitted with a ground.
The bracket of the pumps is fitted with a ground cable. That must be grounded.
Do not install the paint drums underneath the pumps or the electric equipment.
Place them in front of the frame. Install a cover on the drums to reduce the diffusion
of gas and vapours in the booth.
The electrical cable connecting the chassis mounted electric components to the
control box must be installed so that at no time is any risk from mechanical damage,
P
chemical corrosion or excessive heat. Please ensure that the wiring loom is kept
separate from any other electrical cables that are not intrinsically safe.

INSTALLATION

There are different ways to install the PU 3000 to answer to the majority of the installations.
The control box of the PU 3000 mixing machine must be installed outside the
spray booth in a safe area.
Assembly for piloting outside the booth :
The machine is in two parts to enable the control
box to be fitted outside the booth (cable of 8 m /
26.2 ft between the 2 elements).
Nota : Drawing of a unit, model PU 3000
Airmix
Assembly for machine control in the booth :
There is a booth mounting control kit (available
in option).
That kit enables the user to fix the control box
on the booth by means of a glass panel and to
control the machine inside the spraybooth.
The control is carried out thanks to a magnet
provided with the machine. The distance
between the control box and the fluid frame is
of 8 m / 26.2 ft (cable supplied with the
machine).